Nov 05, 2018 · Monday, November 05, 2018 Singapore – Herrenknecht recently released a report on the successful completion of a drainage tunnel in Singapore. The project, which broke through in December 2017, required the construction of 1,000m-long twin tunnels with an excavated diameter of 5,250mm and a minimum distance between the tubes of 2.46m.