transfer from wheel to rail. The first campaign, performed in June 2004, was part of testing of a new brake system on a wagon and was performed on a closed-circuit test track. The second campaign, performed in October 2004, was part of tests of a new braking system, but here the tests were performed in revenue service. Both campaigns were part of